Case name: 25 tph SZL series coal-fired water tube boiler project for textile industry

Case type: Coal-fired boilers cases

Equipment: SZL25-1.25-AⅡ

Capacity: 25 tph

Location: Pakistan

Project boiler medium: Steam

Company name: AL RAHIM TEXTILE INDUSTRIES

 

Coal-fired boilers cases
Coal-fired boilers cases

 

Customer Feedback

Thank you for ZOZEN’s high efficiency water tube boilers, which make the fuels can be fully burned, helping save our running cost. ZOZEN’s specialized technology and the devoted service have impressed us a lot. We have planned to be a return customer.

Coal Fired Boilers Cases introduction

Water tube boilers are used to provide steam for the processes of dyeing, drying and printing in textile industry. Al-Rahim is a leading home textile manufacturer and exporter from Pakistan, producing quality products, like towels, bedding and kitchen linens, etc. The products have been exported to world renowned companies. Since the company’s previous boilers cannot reach the ever-expanding production demand, Al-Rahim plans to order another water tube boiler. After knowing ZOZEN’s powerful comprehensive strength, Al-Rahim has great confidence in ZOZEN’s quality of boilers and purchases one set of 25 tph coal-fired water tube boiler. This kind of water tube boilers are also used by other textile enterprises, such as YUNUS TEXTILE MILLS LIMITED, NOOR FATIMA FABRICS PVT LTD, FEROZE1888 MILLS LIMITED, etc., which gains the good reputation in Pakistan.

Coal-fired boilers cases double drum longitudinal chain grate boilers. The boiler body is composed of a longitudinal upper and lower drum and a convection tube bundle. The left and right sides of the combustion chamber are equipped with light tube water wall tube. The boiler is divided into upper and lower parts, the upper part includes the boiler body, the steel frame set upper furnace wall, the lower part includes the coal bucket, chain grate, the steel frame of the base and the lower furnace wall, and the other parts are assembled and delivered except the middle partition wall which is constructed on the spot. Cast iron economizer and air duct at the end of the boiler are delivered with the furnace. Welcome the majority of users to come to my factory to consult procurement!